Full-cost water

From WebRef.org
Jump to navigationJump to search

An annual rate for water delivered from Bureau of Reclamation facilities, which includes project construction costs attributed to irrigation, as well as outstanding deficits on operation and maintenance charges, with interest on both accruing from October 12, 1982. The term is defined in Section 202 of the Reclamation Reform Act of 1982. The Bureau charges full-cost for water delivered to lands above the acreage limitation.

Sponsor: Disfruta de hasta un 30% de descuento en The Grand at Moon Palace. Reserva anticipada 2020.